First Extension Tender Announcement
North Petroleum
International Company Limited holds rights for Exploration, Appraisal,
Development and Production of the Qurnain Contract Area /Iraq, which covers an
area of 8773 km2 and is situated in SW Iraq, within the Al-Najaf Governorate, is
pleased to make the following public tender announcement:
Tender
Title |
Provision of Mud Logging, Wireline Logging, Well Testing,
Acidizing, CTU, Nitrogen Lifting, Wellsite & Access Road Construction
Services |
Tender Number |
002-SC-25-QPC |
Tender Announcement Website |
1) All
the Bidders should register in our system following the instruction of below
website (online bidding system): https://erp.qurnainpetroleum.com/obs/a/login 2) After
Company Confirmation, only the bidders have been registered successfully can
download our ITB documents and all clarifications. |
Online Bidding System
Manual |
Bidder
shall follow SECTION 6_ITB_Online Bidding System Manual |
Bid Closing Date |
Extend from 20th April
2025 to No later than 16:00 (Baghdad
Time), on or before 27th April 2025. In the event that closing
date coincides with an official holiday or curfew, the closing date shall be
automatically extended to the following working day. |
Bid
Delivery |
The bid proposals
shall be submitted as per the procedure specified in Online Bidding System
Manual.
For hard copy of bid Bond
package must be delivered by following information. Attention: Mr. Xu
Xiaowei Address: EBS
Petroleum S2 Camp, Nahrawan, Baghdad, Iraq. Tel: +964 (0) 773 493
7892/ 077 4818 8749 |
Tender
Contact Emails |
All clarification and correspondences
from Bidders shall be via online bidding system. |
Entry
Pass |
Bidder
must provide entry pass application form (refer to attachment C in Section 1)
at least 2 working days prior to Bid Closing Date. |
Bid Validity Period |
Subject to Article 12.0 in Section 1, Bidder’s bid Proposal
shall be irrevocable for a period Two Hundred and Ten (210) calendar days (“Bid
Validity Period”). |
Main Factors |
All
bidders should focus on the below main factors, including but not limited to: (1)
Submission of BID ACKNOWLEDGEMENT (refer to attachment A in Section 1) (2)
Bid bond submission (3)
Commercial proposal is separate from the technical proposal. (4)
A bidder is considered eligible to participate in tenders if it is not under
suspension or blacklisted in Iraq or Internationally banned. (5)
A bidder and its affiliate are considered unqualified to participate in the
tender if it is part of an ongoing litigation/arbitration with the Company or
the outcome of a litigation/arbitration proved the bidder is in breach,
unless otherwise agreed with related Government authority required by
Company. (6)
Bidders are not allowed to provide goods, works or services under a contract
where they provide consulting services unless otherwise agreed with related
Government authority required by Company. the only exceptions would be
Turnkey Contracts where design, supply and construction activities are an
integral part of the Contract. (7)
A bidder may submit only one bid or participate as a joint venture partner or
Consortium member (if allowed for this tender) in only one bid for each
tender. Failure to comply will result in the disqualification of that
bidders. |
Bid Bond |
Bid
Bond: 80,000.00 USD (Eighty Thousand US Dollars). The
Bid Bond must be delivered by hand to Company in sealed envelope and
duly marked and stamped on outer envelope. Subject to Article 12.0 in Section 1, the original validity of
the Bid Bond shall be the same as aforementioned Bid Validity
Period |
Clarification and
Extension |
Subject
to Article 5/Section 1, Bidders shall submit their clarification request no
later than 7 calendar days before Closing Date, unless otherwise requested by
Company. Subject
to Article 12 / Section 1, extension request from bidders shall be made no
later than 3 working days before Closing date,unless otherwise requested by Company. |
Joint Bidding |
Joint bidding is NOT accepted by the COMPANY. |
End